BNT-85HE Twin Tank Alternating System

Description

  • Tank #1 Service / Tank #2 Standby: Tank #1 remains in service until its capacity is depleted.
  • Tank #2 Service / Tank #1 Regeneration: When Tank #1 reaches zero, its outlet valve closes, Tank #2 comes online for service, and Tank #1 begins regeneration.
  • Tank #2 Service / Tank #1 Standby: After Tank #1 completes regeneration, it enters standby until Tank #2 reaches zero.
  • Tank #1 Service / Tank #2 Service: During high flow rates exceeding the preset trip point, the standby tank comes online to increase capacity.

Smart System Features:

  • Automatic tank switching to maintain continuous soft water supply
  • External motorized ball valves bring standby tanks online during high demand
  • Depleted tanks immediately enter regeneration while preventing hard water from entering the service line

New Features:

  • Up-flow Regeneration: Provides high efficiency with ultra-low hardness leakage (<1 ppm)
  • Soft Water Refill: Adds treated water to the brine tank to keep brine clean and reduce maintenance
  • Master Controller: Fully programmable electronic controller with adjustable cycles
  • Advanced Diagnostic Information: Easily troubleshoot and access real-time system data
  • Backwash Override: Reduces regeneration water usage by skipping preset backwash cycles

Applications:
Apartments – Boiler Treatment – Motels – Schools – Nursing Homes – Office Buildings – Resorts – Restaurants – Hospitals – RO Pre-Treatment – Cooling Towers – Car Washes – Dairies – Factories – Laundromats

Reviews

There are no reviews yet.

Be the first to review “BNT-85HE Twin Tank Alternating System”

Your email address will not be published. Required fields are marked *